APPLICATION
APPLICATION
If you have any questions, feel free to contact us anytime.
WingsTower A1208, 12 Dongbu-ro 169beon-gil, Jinju-si, Gyeongnam-do, Republic of Korea, 52818
TEL +82-55-755-7529 FAX +82-55-761-7529
MAIL mfrc@afdex.com
ⓒ 2024. MFRC All rights reserved.
An analysis of the 5-stage hollow shaft swaging process was made. In this process, the change of the thickness is very high in the first and second stages. The position of the workpiece is controlled by the mandrel in the first and second stages and pusher controlled the workpiece motion in the third stage. Above figure shows the final deformed workpiece and the process consisted of totally 5310 blows.