Simulation of hub spindle hot forging process > Conventional forging

본문 바로가기

Conventional forging

Simulation of hub spindle hot forging process

Closed die forging without flash Hot Forging AFDEX3D

페이지 정보

작성일posted on

본문

 




 

 


 

   A closed-die forging process without flash was simulated using a rigid-viscoplastic finite element method. The process is characterized by no flash allowed along the interface between the upper and lower dies. Mesh system with effective strain is shown in the figure and animation.


WingsTower A1208, 12 Dongbu-ro 169beon-gil, Jinju-si, Gyeongnam-do, Republic of Korea, 52818

Copyright 2007. MFRC and GNU All rights reserved.

TEL +82-55-755-7529 FAX +82-55-761-7529 MAIL [email protected]

▲ To the top