[Larger slab][Optimal Design]Open-die forging of larger slab

An open-die forging process of larger slab was simulated to conduct process design optimization to increase product quality as well as yield rate. Fig. shows a typical example, which consists of about 300 blows. The simulation was conducted in semi-automatic way, i.e., user-intervention is made only when material adjustment is needed, for example, rotating and initializing it.

Do you have any questions
about metal forming simulations?

Send us your comment, question or suggestion, or make a request.
We'll be in touch as soon as we can.

주소
경상남도 진주시 동부로169번길 12, 윙스타워 A1208
TEL
055-755-7529
FAX
055-761-7529
E-MAIL
mfrc@afdex.com
주소
경상남도 진주시 동부로169번길 12, 윙스타워 A1208
TEL 055-755-7529
FAX 055-761-7529
E-MAIL mfrc@afdex.com

Copyright ⓒ 2025 MFRC Co., Ltd. All Rights Reserved