[열간단조]Simulation of an automatic three-stage hot former forging process


An automatic three-stage hot forging process was simulated in a fully automatic way, including dwelling before or after forming, transferring, etc. Non-isothermal analysis was conducted. The figure shows the metal flow lines and the animation represents the variation of temperature with the time.
Address
Wings Tower A1208, 12 Dongbu-ro 169beon-gil,
Jinju, Gyeongsangnam-do, Republic of Korea, 52818
Jinju, Gyeongsangnam-do, Republic of Korea, 52818
TEL
+82-55-755-7529
FAX
+82-55-761-7529
E-MAIL
mfrc@afdex.com
Address
Wings Tower A1208, 12 Dongbu-ro 169beon-gil, Jinju, Gyeongsangnam-do, Republic of Korea, 52818
TEL +82-55-755-7529
FAX +82-55-761-7529
E-MAIL mfrc@afdex.com
Copyright ⓒ 2025 MFRC Co., Ltd. All Rights Reserved